|
1
|
FTIR Spectroscopy (FTIR Spectroscopy)
|
Harga Normal,
|
450000
|
|
|
2
|
SEM (Scanning Electron Microscope)
Memperoleh 1 (satu) posisi fokus Back‐scattered Electron (BSE), Secondary Electron (SE), & gabungannya (Mix) masing‐ masing 3 (tiga) kali perbesaran.
|
Harga Normal,
|
600000
|
|
|
3
|
SEM (Scanning Electron Microscope)
Memperoleh 1 (satu) posisi fokus Back‐scattered Electron (BSE), Secondary Electron (SE), & gabungannya (Mix) masing‐ masing 3 (tiga) kali perbesaran.
|
Harga Diskon, Lebih dari 5 cuplikan
|
550000
|
|
|
4
|
SEM (Scanning Electron Microscope)
Memperoleh 1 (satu) posisi fokus Back‐scattered Electron (BSE), Secondary Electron (SE), & gabungannya (Mix) masing‐ masing 3 (tiga) kali perbesaran.
|
Menambah 1 Posisi Fokus,
|
250000
|
|
|
5
|
SEM-EDS Point (Scanning Electron Microscope - Energy Dispersive Spectroscopy Point)
Tiap 1 (satu) posisi fokus SEM, dapat 3 (tiga) titik atau area analisa point-ID EDS.
|
Harga Normal,
|
800000
|
|
|
6
|
SEM-EDS Point (Scanning Electron Microscope - Energy Dispersive Spectroscopy Point)
Tiap 1 (satu) posisi fokus SEM, dapat 3 (tiga) titik atau area analisa point-ID EDS.
|
Harga Diskon, Lebih dari 5 cuplikan
|
700000
|
|
|
7
|
SEM-EDS Point (Scanning Electron Microscope - Energy Dispersive Spectroscopy Point)
Tiap 1 (satu) posisi fokus SEM, dapat 3 (tiga) titik atau area analisa point-ID EDS.
|
Menambah 1 EDS Point,
|
100000
|
|
|
8
|
SEM-EDS Line (Scanning Electron Microscope - Energy Dispersive Spectroscopy Line)
satu set scan
|
Harga Normal,
|
1000000
|
|
|
9
|
SEM-EDS Line (Scanning Electron Microscope - Energy Dispersive Spectroscopy Line)
satu set scan
|
Harga Diskon, Lebih dari 5 cuplikan
|
850000
|
|
|
10
|
SEM-EDS Line (Scanning Electron Microscope - Energy Dispersive Spectroscopy Line)
satu set scan
|
Menambah 1 EDS Line,
|
200000
|
|
|
11
|
SEM-EDS Map (Scanning Electron Microscope - Energy Dispersive Spectroscopy Map)
satu set map
|
Harga Normal,
|
1000000
|
|
|
12
|
SEM-EDS Map (Scanning Electron Microscope - Energy Dispersive Spectroscopy Map)
satu set map
|
Harga Diskon, Lebih dari 5 cuplikan
|
850000
|
|
|
13
|
SEM-EDS Map (Scanning Electron Microscope - Energy Dispersive Spectroscopy Map)
satu set map
|
Menambah 1 EDS Map,
|
200000
|
|
|
14
|
QXRD Data (Quantitative X-Ray Difraction Data)
|
Harga Normal,
|
450000
|
|
|
15
|
QXRD Data (Quantitative X-Ray Difraction Data)
|
Harga Diskon, Lebih dari 5 cuplikan
|
400000
|
|
|
16
|
QXRD Analysis (Quantitative X-Ray Difraction Analysis)
|
Harga Normal,
|
800000
|
|
|
17
|
QXRD Analysis (Quantitative X-Ray Difraction Analysis)
|
Harga Diskon, 5
|
700000
|
|
|
18
|
Amorphous quantification Analysis (XRD Amorphous quantification Analysis)
|
Harga Normal,
|
1000000
|
|
|
19
|
ED-XRF (Energy Dispersive X-Ray Fluorescence)
|
Harga Normal,
|
450000
|
|
|
20
|
PSA (Particle Size Analyzer)
|
Harga Normal,
|
1000000
|
|
|
21
|
BET (Brunauer-Emmett-Teller Analysis)
|
Harga Normal,
|
1500000
|
|
|
22
|
TGA (Thermogravimetric Analysis)
|
Harga Normal,
|
1000000
|
|
|
23
|
DSC (Differential Scanning Calorimetry)
|
Harga Normal,
|
1000000
|
|
|
24
|
TEM (Transmission Electron Microscopy)
|
Harga Normal,
|
2300000
|
|
|
25
|
TEM-EDS (Transmission Electron Microscopy - Energy Dispersive X-ray Spectroscopy)
|
Harga Normal,
|
3000000
|
|
|
26
|
Tensile Test (Tensile Test)
|
Harga Normal,
|
1000000
|
|
|
27
|
Hardness Test (Hardness Test)
|
Harga Normal,
|
1000000
|
|